prepare a procedure with typical diagram and Report Sheet (To record all the necessary parameters) for this experiment
This is the story:
We need to do a shop Functional test of our HEI/FFG Pilots operation with High pressure Fuel supply directly to Pilots bypassing the PCV. This is to access/check the maximum pressure up to which our Pilot can operate under PCV wide open scenario in the skid.